中文翻译锅形火口

网络释义

1)pit crater,锅形火口2)pit crater,锅状火山口3)ribbon type burner,带形火口4)W-fired boiler,W形火焰锅炉5)W-firing boiler,W形火焰锅炉6)cylindrical fire tube boiler,罐形火管锅炉

用法例句

    Numerical simulation analysis for W-fired boiler of 300 MW unit in Shaoguan Power Plant;

    韶关发电厂300 MW机组W形火焰锅炉数值模拟计算分析

    By use of numerical simulation calculating software of Fluent,the secondary air duct of a 300 MW unit s W-fired boiler in Shaoguan Power Plant is computed and analyzed.

    应用Fluent数值模拟计算软件对韶关发电厂300MW机组W形火焰锅炉的二次风道进行了计算分析。

    Analysis on sliding-parameter shutdown of 300 MW turbine with cooperation of W-firing boiler;

    W形火焰锅炉配合下的300 MW汽轮机滑参数停机分析

    Effect of air flow and pulverized coal concentration uniformity on combustion in a W-firing boiler;

    W形火焰锅炉的风量和煤粉均匀特性对燃烧的影响

    The 300 MW W-firing boiler for Unit 10 in Shaoguan Power Plant is made by Dongfang Boiler Group Co.

    韶关发电厂10号机组锅炉是东方锅炉(集团)股份有限公司引进美国福斯特·惠勒能源公司(FWEC)技术设计制造的300MWW形火焰锅炉,采用双旋风筒煤粉浓缩型燃烧器。