In this paper,a dual resource-based scheduling problem of flexible production systems is discussed,with the minimum earliness/tardiness(E/T) penalty as the objective.
文中以提前/延期(E/T)惩罚最小为目标,探讨了基于双重资源的柔性生产系统调度问题。