Numerical simulation of temperature field and stress field of sluice piers;
水闸闸墩温度场及应力场仿真分析
Discussion on the reliability of the sluice chamber structure system;
水闸闸室稳定结构体系可靠度探讨
The research on the technology of heightening and consolidating the floodgate suffering the mass-subsidence;
大沉陷量地区水闸加高加固技术研究
Based on analysis of the factors affecting the durability of the floodgates in Shanghai, a BP neural network is established.
以上海地区8座混凝土水闸为研究对象,采用BP反馈神经网络对这8座水闸的运行状态进行分析,比较模拟结果与分析结果,验证了神经网络方法的可行性,并且对于识别上海地区其余未检测的水闸具有普遍意义。
Piers and Bottom Board Temperature Control Design of Gate Piers and Bottom Board of Spillway Water Gates for Yanshan Reservoir
燕山水库溢洪道水闸闸墩和闸底板温控设计
Application on Disposing of Settlement Joint of Pier with Chemical Grouting in Shaping Water Gate
化学灌浆在沙坪水闸闸墩沉降缝处理中的应用
Quantitative Analysis of the Main Factors of Vertical Concrete Cracks in Some Sluice Pier in the Northern Jiangsu Plain
苏北平原某水闸闸墩混凝土开裂主导因素的定量分析
Design of Pre-stressed Pier for Sluice Gate in Third Cascade of Baishuijiang Power Station
白水江三级水电站泄洪闸预应力闸墩设计
The Study of Prestressed Anchor Funicular Applied in Pier Works of Xiao Xia Hydroelectric Power Station;
预应力锚索在小峡水电站闸墩中的应用研究
Effect of Cooling Pipe Measure on Temperature Control and Anti-cracking of Concrete Pier
混凝土闸墩施工期冷却水管温控防裂效果分析
Force State Investigation about Prestressed Pier model of Pushi River Pumped Storage Power Station
蒲石河水库预应力闸墩模型受力状态研究
The Design of the Spillway Crest Outlet Pre-stressed Gate Pier Structure of Jufudu Hydropower Project
居甫渡水电站溢流表孔预应力闸墩结构设计
Comparison on the Schemes of the Neck Position Slotting of Pre-stressed Pier of Pankou Hydropower Station
潘口水电站预应力闸墩颈部开槽方案研究
Prestressing Tendon Construction for Spillway Weir Piers in Guazhi Hydroplant
挂治水电站溢流坝闸墩预应力锚索施工
Structure recheck and reinforcement of pier of spillway tunnel of Lishimen reservoir
里石门水库泄洪孔闸墩结构复核及加固
Influences of Water-Seal Position on Pier Stress of Concrete Gravity Dam
混凝土重力坝止水位置对闸墩应力的影响研究
Effect of United Casting Height of Gate Pier and Bottom Plate on Gate Pier Crack Control
闸墩与底板连浇高度对闸墩防裂效果的影响
head gate structure [irrigation]
渠首闸门,总水闸门[灌溉]
Construction Temperature Observation and Back Analysis of Pier-wall C25 Concrete for Caojie Sluice
草街冲砂闸闸墩C25混凝土施工温度观测反分析
Study on model test for a large scale prestressed pier of a flood releasing and scouring sluice
大型泄洪排沙闸预应力闸墩结构模型试验研究
Analysis and Treatment of Cracking Along Water Current Direction on the Double-hole Water-conveyance Tunnel in Ship Lock of Three-Gorge Project;
三峡船闸中隔墩输水隧洞顺流向裂缝分析与处理
Study on Formation Causes of Pier Cracks and Rehabilitation Procedures for FENGMAN Dam;
丰满水电站溢流坝闸墩裂缝成因分析及其加固技术研究
本网站所收集内容来自网友分享仅供参考,实际请以各学校实际公布信息为主!内容侵权及错误投诉:1553292129@qq.com
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号