Study on change control of PDM system geared to allocation management of products;
面向产品配置管理的PDM系统变更控制研究
Research and Implementation of Change Control Model of Process Execution;
具有变更控制能力的软件过程执行研究与实现
Then the specific requirement acquisition process is described and its change control .
针对机载设备软件AE653/Cert的认证过程进行研究,诠释需求获取过程中的建模方法和原则,给出需求获取过程的具体描述及其变更控制和配置管理。
282 samples about the control rights transferring in the mergers and acquisitions of listing companies between 1997 and 2001 were selected.
针对1997年到2001年我国上市公司并购中控制权变更的282例样本,就其控制权变更公告日效应的平均超常收益率和累计平均超常收益率进行了实证分析。
samples about the control rights transferring in the mergers and acquisitions of listing companies between 1997 and 2001 were selected.
针对1997年到2001年我国上市公司并购中控制权变更的282例样本,就其控制权变更公告日效应的平均超常收益率和累计平均超常收益率进行实证分析。
The Originator has submitted a new i ue to the change control system.
发起人向变更控制系统提交一个新的变更请求。
Change Control Status Reporting(变更控制状态报告) The CCB Chair generates a report at the end of each month summarizing the status of the contents of the change control database.
变更控制委员会主席根据变更控制数据库的内容在月末汇总出变更控制数据的报告。
Tool sends e-mail to the Originator and CCB Chair.
变更控制工具发电子邮件给发起人和变更控制委员会主席。
The Modifier sets the status to Closed. Tool sends e-mail to the Originator and CCB Chair.
修改人设置变更状态为已结束。变更控制工具发电子邮件给发起人和变更控制主席。
The CCB Chair assigns an Evaluator.
变更控制委员会主席指定一个评估人。
Research of Controlling the Integration Alteration of the Architecture Engineering Design Process;
建筑工程设计过程综合变更控制研究
Variation Controlling of Construction Contract Performing;
建设工程施工合同履约中的变更控制
The change control tool sets the issue's initial status to Submitted.
变更控制工具将变更请求的初始状态设置为已提交。
The Originator has submitted a valid issue or change request with all necessary information to the CCB Chair.
发起人提交正确的变更请求或将变更请求和所有必要的信息提交给变更控制委员会主席。
Tool sends e-mail to the Originator, CCB Chair, Modifier, and Project Manager.
变更控制工具发电子邮件给发起人,变更控制委员会主席,修改人和项目经理。
Tool sends e-mail to the Originator and Modifier.
变更控制工具发电子邮件给修改人和发起人。
Research and Implementation of Change Control Model of Process Execution;
具有变更控制能力的软件过程执行研究与实现
Important Roles of Deviation Investigation and Modification Control in Quality System;
偏差调查和变更控制在质量体系中的重要作用
Controlling Project Alteration in Capital Costruction and the Praction and Consideration of Investmant Controlling After the Alteration;
基本建设控制工程变更及变更后投资控制的实践和思考
The Impact of Takeovers and Change of Ultimate Control on Operating Performance of State-owned Enterprises;
国有控制权转移、终极控制人变更与公司业绩
sense switch
更变开关(控制程序的开关),读出开关
The Confirmation and Control of Construction Cost in Project Change;
论工程变更后工程造价的确定与控制
Improving management of design alteration to control railway capital investment;
强化设计变更管理 控制铁路工程投资
本网站所收集内容来自网友分享仅供参考,实际请以各学校实际公布信息为主!内容侵权及错误投诉:1553292129@qq.com
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号