A survey of Jincang Smelter' s sulphuric acid sub-item engineering of ADB project;
金昌冶炼厂亚行项目硫酸子项工程概况
The Significance and Influence of Qi-Lin Expressway Project Performance Management System;
论祁临路项目执行管理体系的意义及延伸——亚行项目借鉴(之一)
On Game Rules in Link with International Market from First-phase Works of Project with Asian Bank Loan;
从亚行项目前期工作看国际接轨后的游戏规则
A Feasibility Study of Sub-altitude Training for Short-distance Events in Track Cycling
论场地自行车短距离项目亚高原训练的可行性
Situation of Development and Operation of Nitric Oxide Reduction CDMProject in Liuzhou Chemical Industry Co. Ltd
柳化公司氧化亚氮减排CDM项目建设运行情况
Results of MHC Project with World Bank Loan implemented in Sanya City
三亚市实施世行贷款妇幼卫生项目效果分析
Investment Mechanism of Asian Development Bank and Executing Strategies in Sanjiang Plain Wetlands Protection Project;
三江平原湿地保护项目中亚洲开发银行的投资机制和项目执行对策的研究
Adriatic and Ionian Highway project
亚得里亚海和爱奥尼亚海公路项目
Responsible for planning and implementing larger and more complex projects to improve throughput of our Asian Operations.
负责计划和执行提高亚洲区生产能力的大而复杂项目。
Of course, the project has not been performed for the purpose of understanding Homer's Iliad or the Trojan War.
当然,该项目不是为了了解荷马的《伊里亚特》或特洛伊之战而进行的。
Feasibility Study on Implementing 18 Months Fuel Cycle Project in Daya Bay NPP
大亚湾核电站实施18个月换料项目的可行性研究
The item collecting funds of ADB loans is one of main channels for absorbed forein capital in China.
亚行贷款项目融资是我国利用外资的资源主要渠道之一。
The Benefit Monitoring & Evaluation of Jilin Province Flood Damaged Highway Rehabilitation Project Financed by ADB
吉林省亚行贷款水毁公路重建项目效益监测与评价
Utilization and management of imprest account of ADB loan in water resources projects;
浅析亚行贷款周转金账户在水利项目中的使用管理
Results of implementation of World Bank loan maternal health project in Sanya City
三亚市应用世行贷款完善妇幼卫生项目效果分析
Analysis on American Colleges' Continuing Education Strategies:A Case Study of TCCU
美国哥伦比亚大学继续教育学院培训项目运行模式探析
Function Study of ADB s Immigration Policy Supervision in Resettlement Project of the Yellow River ADB Loan;
浅谈亚行移民监督政策在山东黄河亚行贷款项目移民安置过程中的作用
Project Plan Execution- carrying out the project plan by performing the activities included therein.
项目计划执行-行工序来实施项目计划。
Such an effort will cost $20 billion, according to a recent report by Credit Lyonnais Securities Asia.
根据里昂信贷银行亚洲证券部最近发表的一项报告,所有这些项目将耗资近二百亿美元。
本网站所收集内容来自网友分享仅供参考,实际请以各学校实际公布信息为主!内容侵权及错误投诉:1553292129@qq.com
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号