When for cooling stave a critical point of its later service period is reached the accelerated breakage will be occurred , it was caused by incrustation formed on the water pipe and therefore increased of the thermal resistance.
高炉冷和壁进入晚期工作临界点后有一个快速破损期,为水管结垢热阻增大所致。
本网站所收集内容来自网友分享仅供参考,实际请以各学校实际公布信息为主!内容侵权及错误投诉:1553292129@qq.com
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号