Quality management of prophase construction of Laxiwa Project--Discuss on management under the new structure of construction teams;
拉西瓦前期工程施工质量管理——由水电施工队伍的结构变化对新形势下管理的初探
Mechanization of earth work construction machinery;
土方工程机械化施工管理
This article expressed the requirement,the test objects,the test standard,and the test method of the fill materials for the earth work,and show the differences from China.
从试验的角度着重阐述了国外土方工程对填料的要求和试验检测项目以及试验所采用的试验标准和试验方法,并简单介绍了该方法与国内公路工程试验相关标准和方法的不同之处,对国外试验工作具有参考和借鉴意义。
On earthwork construction in deep foundation pit of high-rise building;
浅谈高层深基坑土方工程施工
This paper expounds the influence of the construction organization plan on the cost estimation of the earthwork from aspects of the construction organization investigation, construction methods, construction machines and tools selection, and rearrangement of earthwork and stonework, etc.
从施工组织调查、施工方法、施工机具选择、土石方调配等方面阐述了施工组织设计对路基土方工程成本的影响,对今后路基工程施工组织设计的编制和成本管理具有一定的指导作用。
Especially, in respect of concrete work, reinforcement project and earthwork detailed construction technologies are introduced and application effects are analyzed in the end.
以大同煤炭集团冬期钢筋混凝土工程施工为例 ,阐述了冬期钢筋混凝土的施工原则 ,详细介绍了冬期混凝土工程、钢筋工程、土方工程的施工技术 ,并提出了具体应用效
Brief description of project plan justification during the initial stage for main bridge of Sutong Bridge
苏通大桥主桥前期工程方案论证概述
The Research of Standard System of Earlier Stage Cost Making of Railway Project;
铁路建设项目前期工程造价计价标准的研究
The Exploration of Construction Cost in Earlier Stage;
关于建设项目前期工程造价控制的探讨
Major Measures to Intensify the Management of Construction Cost in Preliminary Project Stage;
加强项目前期工程造价管理的主要措施
The first phase of the project was completed two months ahead of schedule.
第一期工程提前两个月完工。
Discussion on Preparatory Work in Earlier Stage of Power System Engineering Management
动力系统工程管理前期准备工作探讨
Applied Research on Project Management in the Earlier Period Consultation of the Environmental Sanitation Engineering;
环卫工程前期咨询项目管理应用研究
Controlling Approach to the Project Cost in the Prophase of Capital Construction;
工程造价在基本建设前期的控制途径
The Prior Period Study of Enterprise Construction Project and Its Operating Management;
企业工程项目的前期研究与运作管理
On Proceeding and Positive Control in Construction Project Cost;
工程建设投资的前期与事先主动控制
Research on Pre-bid Decision-making Process in Construction Engineering Project
建筑工程项目投标前期决策分析研究
On the Preparatory Work Experience of Power Engineering;
浅谈做好电力工程前期工作的几点体会
Some issues of early-stage work for Dateng Gorge Hydraulic Complex
关于大藤峡水利枢纽工程前期工作的几点思考
Discussion on problems existing in early-stage work of water and hydropower project
浅议水利水电工程前期工作中存在的几个问题
Meanwhile, efforts will be stepped up to complete the preparatory work for the project to divert the water in the south to the north and begin the construction of the project as quickly as possible during the 10th Five-Year Plan period.
同时,加紧南水北调工程的前期工作,力争“十五”期间尽早开工建设。
Pollution-prevention for Land Formation Project of the First Four Berths of Dayaowan 1st-phase Project of Dalian Port
论大连港大窑湾港区一期工程前四个泊位陆域形成工程污染防治
It was not clear what the timeframe for the LNG project would be.
目前尚不清楚该液化天然气项目的工程期限。
Preliminary Analysis and Assessment of Regional Engineering Geological Conditions in Beijing Yizhuang Town;
北京亦庄规划新城前期区域工程地质评价分析
本网站所收集内容来自网友分享仅供参考,实际请以各学校实际公布信息为主!内容侵权及错误投诉:1553292129@qq.com
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号