But the volume fraction of particles in composite fabricated by prefabricate method was finite.
对陶瓷颗粒进行预处理之后,在非真空感应炉中,利用预制件法、无旋涡机械搅拌法和半固态机械搅拌法制备了颗粒增强铝基复合材料。
Taking Sutong bridge 75m continuous concrete girder as an example,this article introduces techniques and geometry control methods on short-line prefabrication of box-girder,cantilever assembly by bridge erector and erection of external cable.
以苏通大桥75m预应力混凝土连续梁施工为背景,重点介绍了箱梁节段采用短线法预制、架桥机悬臂拼装和体外索安装的有关施工技术和线形控制技术。
Application of Precast Box Girder by Short Line Casting in Hong Kong Disneyland Construction Project
短线法预制箱梁在香港迪士尼工程中的应用
Geometric Shape Control of Precasting of PC Box Girder Segments by Short-Line Match Method
预应力混凝土箱梁短线法节段预制线形控制
Alignment Control for Short-line Precast Segmental Bridges
短线法节段预制拼装桥梁线形控制探讨
On Box Girder Precast Segment Assembling by Short-line Method & Alignment Control Technological Principle
短线法箱梁节段预制拼装及线形控制技术原理
The research on method of geometry-control during erection of the short-line bridge
基于几何控制法的短线预制拼装箱梁研究
Principle of Precasting Concrete Segmental Girders of Hau Hoi Wan Sea-Crossing Bridge,Hongkong with Short-Line Match Method
香港后海湾跨海大桥预制混凝土节段梁短线台座法预制原理
Application of Short-line Segment Prefabrication Method in Hongkong Houhaiwan Trunk South Section Project
短线节段预制法在香港后海湾干线南段工程中的应用
Prefabricated Construction Technology of Matched Short-Molding Method for 60m Segmental Box Girder of Shanghai Yangtze River Tunnel-Bridge
上海长江隧桥60m节段梁短线法匹配预制施工工艺
Study on Construction Geometry Control of Prefabrication Based on Short-Line Method and Cantilever Erection Continuous Girder Bridge;
短线预制悬臂拼装连续梁桥施工线形控制研究
Key issues of prefabrication of the pre-stressed concrete box segments using the short line casting method
预应力混凝土箱梁短线台节段预制关键技术
Study on Construction Technology of Box Girder Segment s Stub Matching Precast and Cantilever Erection;
箱梁短线匹配预制及悬臂拼装施工技术研究
Research on Short-time Traffic Flow Forecasting for Urban Traffic Control
面向城市交通控制的短时交通流预测方法研究
Research of Database Management System for Control of Short-Line Match-Casting Bridge Construction;
短线匹配法桥梁施工控制数据库管理系统研究
On the Legal System of Disgorging the Profits of Short-swing Trading by Insiders;
内部人短线交易收益归入法律制度研究
Thinking on disgorging short-swing insider profit;
对完善我国短线交易归入制度的法律思考
Sensitivity Analysis and Identification of Parameters on Construction Control of Short-Line Method
短线法施工控制参数敏感性分析及参数识别
dog-leg spool piece
折线形法兰联接短管段
Linear Method, Nonlinear Method and Neural Network Method of Predictive Control
预测控制的线性方法、非线性方法和神经网络方法
本网站所收集内容来自网友分享仅供参考,实际请以各学校实际公布信息为主!内容侵权及错误投诉:1553292129@qq.com
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号