您好,欢迎访问优校网! 收藏本页 手机访问
今天是:

slope upgrading works是什么意思


中文翻译斜坡加固工程

网络释义

1)slope upgrading works,斜坡加固工程2)slope preventive/stability works,巩固斜坡工程3)slope stabilization works,斜坡巩固工程4)reinforcement engineering of slope,边坡加固工程5)slope stabilization works,斜坡稳定工程;斜坡巩固工程6)slope works,斜坡工程

用法例句

    During 1998, a total of $774 million was spent on the LPM Programme to increase the annual output of slope upgrading works.

    一九九八年内,防止山泥倾泻计划共动用7.74亿元,以期增加每年完成斜坡巩固工程的数量。

    Study on Reinforced Mechanism and Applications in Loose Slopes Using Prestressed Anchor Cables and Stabilizing Piles with Prestressed Anchored Cables;

    松散斜坡体锚、桩加固作用机理与工程应用研究

    engineer inspection [slope maintenance]

    工程师检查〔斜坡维修〕

    Slope Safety Division [Civil Engineering Department]

    斜坡安全部〔土木工程署〕

    Experiment Study on Mixed-In-Place Pile Improve Slope Soft-Soil Foundation's Engineering Properties

    水泥土搅拌法(MIP)加固斜坡软弱土地基的工程特性试验研究

    A Engineering Feasibility Study of Rock Bank Slope at Mashuihe River Bridge Site;

    马水河桥位斜坡岩体工程适宜性研究

    Study on the Engineering Characteristics of Embankment on Slope Soft-Soil Foundation;

    斜坡软弱土地基路堤的工程特性研究

    Major highway projects will further extend and reinforce the main road network.

    大型公路工程将进一步扩大及巩固主要道路网。

    Consolidating the Achievements in Laboratory Evaluation;

    巩固实验室评估成果 实施内涵建设工程

    Study on Anchorage Properties of Slope Rockmass and Its Engineering Applications;

    边坡岩体锚固性能研究及其工程应用

    Application of Prestressed Anchored Cable in Reinforcement of Side Slope

    预应力锚索在边坡加固工程中的应用

    Improve Policies and Consolidate Achievements to Ensure Sustainable and Healthy Development of the Conversion of Cropland to Forestland Project;

    完善政策 巩固成果 确保退耕还林工程持续健康发展

    On Implementing Marxist Youth Training Project and Consolidating the Party's Administrative Foundation

    实施高校青年马克思主义者培养工程巩固党的执政基础

    slope recataloguing exercise

    重新记录斜坡的工作

    Establishment and Considation of the Status of The People s Action Party as the Party in Power in Singapore;

    试论新加坡人民行动党执政地位的确立与巩固

    Slope AnchorAsks for and Strengthens the Main Point of Construction and Quality Control at the High Side

    高边坡锚索加固工程施工要点与质量控制

    Design and construction of widening,reconstruction and reinforcement of high slope road

    某工程高边坡道路拓宽改造加固的设计及施工

    Discussion of Cable Power Test Methods of Reinforcement and Reconstruction of the Cable-stayed Bridge

    浅析斜拉桥加固改造工程的索力测试方法