No templates are installed on this server. See your system administrator.
本服务器上未安装模板。请与您的系统管理员联系。
Smarty s Installment,Disposition and the Applied Realization;
PHP模板引擎Smarty的安装配置及应用实现
Prefabrication and Installation of Large Fast-assembly Formwork in Saudi SS-22 Substation
沙特SS-22变电所大型快装模板预制与安装
Installation and inspection of concrete simply supported girder with post-tensioned prestressing
后张法预应力混凝土简支箱梁模板安装与检查
Wall form installation please see attached sketch No.-4. Expended cement mortar shall be used for sealing after form dismantled and pull bolts removed.
墙板模板安装见附图4。在模板拆除对拉螺栓拿出后,采用微膨胀水泥砂浆封堵。
The frame on which boards are mounted.
安装电路板的框架。
Install upper column shrouds.
安装上转向柱围板。
Install the screw in the trim panel depression.
安装饰板压低处的螺钉。
panel mount variable optical attenuator
面板安装可变光衰减器
Instrument Panel End Cap Remove/Install
仪表板端盖拆卸/安装
Instrument Panel Top Cover Remove/Install
仪表板上盖的拆卸/安装
inspection of hatch coaming
货舱口围板安装检验
FENDER INNER MOUNTING BOLTS
防护板内安装螺帽(2)
The template required to complete this operation was not found. Please run setup and then try this operation again.
未找到完成此操作需要的模板,请运行安装程序,然后再试一次。
This paper details the structural design, erection &lift of formwork.
该文详细地说明了该模板的结构设计、安装提升的要领。
formwork structure and installation technology of 60m precast box girder of Qingdao Gulf Bridge
青岛海湾大桥60m预制箱梁模板结构及安装施工技术
Front posts are provided for rails, runs, and hinges.
前部支撑板可安装挡板、轨、页。
card of pattern
装有几个模型的型板
本网站所收集内容来自网友分享仅供参考,实际请以各学校实际公布信息为主!内容侵权及错误投诉:1553292129@qq.com
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号