您好,欢迎访问优校网! 收藏本页 手机访问
今天是:

resetting of forms是什么意思


中文翻译模板的重安装

网络释义

1)resetting of forms,模板的重安装2)mounting shuttering,安装模板3)installation of formwork,模板安装4)plate mounting,板的安装5)load-bearing panels installed,承重板安装6)improved mounting plate,改进的安装板

用法例句

    No templates are installed on this server. See your system administrator.

    本服务器上未安装模板。请与您的系统管理员联系。

    Smarty s Installment,Disposition and the Applied Realization;

    PHP模板引擎Smarty的安装配置及应用实现

    Prefabrication and Installation of Large Fast-assembly Formwork in Saudi SS-22 Substation

    沙特SS-22变电所大型快装模板预制与安装

    Installation and inspection of concrete simply supported girder with post-tensioned prestressing

    后张法预应力混凝土简支箱梁模板安装与检查

    Wall form installation please see attached sketch No.-4. Expended cement mortar shall be used for sealing after form dismantled and pull bolts removed.

    墙板模板安装见附图4。在模板拆除对拉螺栓拿出后,采用微膨胀水泥砂浆封堵。

    The frame on which boards are mounted.

    安装电路板的框架。

    Install upper column shrouds.

    安装上转向柱围板。

    Install the screw in the trim panel depression.

    安装饰板压低处的螺钉。

    panel mount variable optical attenuator

    面板安装可变光衰减器

    Instrument Panel End Cap Remove/Install

    仪表板端盖拆卸/安装

    Instrument Panel Top Cover Remove/Install

    仪表板上盖的拆卸/安装

    inspection of hatch coaming

    货舱口围板安装检验

    FENDER INNER MOUNTING BOLTS

    防护板内安装螺帽(2)

    The template required to complete this operation was not found. Please run setup and then try this operation again.

    未找到完成此操作需要的模板,请运行安装程序,然后再试一次。

    This paper details the structural design, erection &lift of formwork.

    该文详细地说明了该模板的结构设计、安装提升的要领。

    formwork structure and installation technology of 60m precast box girder of Qingdao Gulf Bridge

    青岛海湾大桥60m预制箱梁模板结构及安装施工技术

    Front posts are provided for rails, runs, and hinges.

    前部支撑板可安装挡板、轨、页。

    card of pattern

    装有几个模型的型板