您好,欢迎访问优校网! 收藏本页 手机访问
今天是:

CCM(Cut and Cover Method)是什么意思


中文翻译明挖覆盖工法

网络释义

1)CCM(Cut and Cover Method),明挖覆盖工法2)excavation after covering,盖挖工法3)cut and cover tunneling,明挖法施工4)topdown construction,盖挖逆作法施工5)overriding declaration,覆盖声明6)Covered excavation,盖挖法

用法例句

    The application of dual-purpose pile in topdown construction can not only save costs,but also make the mechanic condition of substructure walls more rational.

    在盖挖逆作法施工中采用"一桩两用"技术,不仅可节约大量费用,而且使地下结构的外墙的受力状态更为合理。

    We have proposed a process ontology model by adopting an inheritance mechanism with overriding declaration and monotonic inheritance.

    通过引进带覆盖声明的、单调性的继承机制,建立了一种新的过程本体论模型。

    A covered excavation was adopted, which not only eliminated the problem of traffic blockage but also protected the adjacent buildings and services above the foundation pit, with much shorter construction period.

    通道采用了盖挖法施工 ,既解决了地面全断面行车 ,又确保基坑上部管线及邻近建筑物的安全 ,减少了基坑施工周期。

    Combined with shallow tunnel of Maoshan west tunnel,this paper compares the covered excavation with open-cut method on technology and economy.

    并对盖挖法施工方案及施工工艺进行了介绍。

    Analysis on Covered Top-down Excavation Technique Adopted in Practical;

    盖挖逆作法施工技术在某工程中的实践分析

    On the construction technique of the cover and excavation top-down method in the reconstruction project for Suzhou railway station

    苏州火车站改造工程盖挖逆作法施工技术

    Analysis and Study on Flat Slab with Opening for Cover and Excavation Top-Down Method;

    盖挖逆作法施工中预留孔洞的分析与研究

    Construction Technique of Intermediate Pile for Subway Station with Top-Down Inverse Method

    盖挖逆作法地铁车站的中间桩施工技术

    Comprehensive Construction Technology of Cover and Cut Reverse Method in Metro

    地铁盖挖逆作条形基础综合施工技术

    Top-Down Construction Technique for Excavation of Working Shaft Cover of TSM in Shanghai Subway Station

    上海地铁车站盾构工作井盖挖逆作施工技术

    Cover and Cut Method and Finite Element Analysis of Comprehensive Transportation in Futian Subway Station

    深圳市福田站地下综合交通枢纽工程配套设施盖挖逆作施工方法与结构整体有限元分析

    Total Reverse Construction Method Construction Technology for Underground Chamber Excavation

    全“逆作法”地下室挖运土方施工技术

    Application of Intermediate Post Pile in Segment of Cover-excavation Reverse Operation in Transportation Hub Engineering,Tianjing Station

    天津站交通枢纽工程盖挖逆作段中间立柱桩施工技术

    The techniques of topdown construction method for air shaft of metro line

    地铁中间风井超深基坑明挖逆作法施工技术

    Monitoring and Analysis on Cover-Excavation Consequent Operation of Metro Station;

    地铁车站盖挖顺作法施工监控量测与分析

    Assessment of Construction Methods the Top-Down and Excavation under Cover Board Used in Harbin Subway HLJ Univ. Station;

    哈地铁黑大站逆作与盖挖法评价研究

    Application of Timbering System with Prestressed Anchor Rope in Top-Down Construction

    预应力锚索支护体系在盖挖逆作工程中的应用

    Application and Construction Technology of Covered Excavation in Shallow Tunnel

    隧道浅埋段盖挖法的应用与施工技术

    Study on Design and Technology for Building Subway Station with Tunneling and Top-down Method;

    地铁车站暗挖逆筑法设计施工技术研究

    Analysis of Supporting Structure Behavior of Deep Pit with Cover Plate Semi-inversed Construction Method

    深基坑盖板半逆作施工的支护结构性能分析

    Construction Technology of Cover-cut Method in Shallow-buried Portal Section of Houyuntai Mountain Tunnel

    后云台山隧道洞口浅埋段盖挖法施工技术

    Research on Key Technologies of the Design and Construction about Temporary Road-bridge System in Cover-excavation Metro

    盖挖法地铁施工临时路桥体系设计与施工的关键技术研究