您好,欢迎访问优校网! 收藏本页 手机访问
今天是:

under beam是什么意思


中文翻译梁底

网络释义

1)under beam,梁底2)mudsill,底梁3)composition style furnace beam bottom,梁底组合4)Chassis carling,底板纵梁5)beam bottom pouring mortar,梁底注浆6)bottom die of box-beam,箱梁底模

用法例句

    Based on the construction features of the large mudsill and bracket in the steel structures of a type of electrostatic precipitator , a finite element model is established with large scale finite element analysis software I DEAS, and the structural stress (strain) and displacement (deformation) of the mudsill and bracket under all sorts of loads are analyzed.

    根据某型号电除尘器钢结构主要部件底梁及支架的结构特点,利用大型通用有限元分析软件I DEAS,建立其实体装配模型和有限元模型,并对底梁和支架进行了静力学的有限元分析,研究了在各种载荷的共同作用下底梁和支架结构应力(应变)以及位移(变形)情况。

    The mudsill and bracket of RWD/QX--48 X1X 2 electrical dust precipitator act as the primary study subject in this paper, and finite element analysis and optimization analysis are made by use of large-scale finite element analysis software I-DEAS, aiming at the demerit of nonstandard design on electrical dust precipitator in our country.

    本论文主要以RWD/QX—48×1×2型电除尘器的底梁和支架为研究对象,针对我国电除尘器生产单位对其设计不规范、结构不合理的缺点,利用大型通用有限元分析软件I-DEAS对其进行了有限元分析和优化计算。

    A structure that supports the end of a bridge.

    桥台支撑桥梁底部的结构

    Cause Analysis of Girder's Lengthways Cracks of Some Cable-Stayed Bridge

    某斜拉桥主梁底板纵向裂缝成因分析

    After closure, continuity tendons would be provided in the bottom of the box.

    合拢以后,箱梁底部布置有连续的预应力筋。

    Analysis of Bottom Slab Crack under the Anchorage of P.C.Continuous Box Girder

    预应力混凝土连续箱梁底板锚下裂缝分析

    Analogue Simulation for Crown Cantilever of Masonry Arch Dam

    砌石拱坝上游拱冠梁底部拉应力仿真分析

    A Study on Surface Stripping Effect of Concrete Box Girder Floor Plate Due to Prestressed Tension

    预应力张拉对箱梁底板混凝土的剥离效应研究

    Analysis on construction quality problem of concrete floor beams

    混凝土楼面梁底夹砂层施工质量问题剖析

    engine mud sill

    钻机动力机下纵向底梁

    Base structure side crossbearm adds compcting cylinder. (opening aperture of the fork lift packet).

    底架侧梁增加压紧汽缸(叉槽开口处)。

    Research on the Number Simulation of the Forming Process of the Motorcar s Chassis Beam;

    汽车底盘横梁拉深成形数值仿真研究

    Installation of bottom equipment of stepping girder furnace;

    浅谈步进梁式加热炉炉底设备的安装

    a timber along the top of a wall to support the ends of joists, etc., and distribute the load.

    沿墙放着的支持托梁等的底端分担重量的木板。

    Analysis of Effect of Transverse Prestressed Space Action of Arc Bottom and Wide Box Beam

    弧形底宽箱梁横向预应力空间作用效应分析

    The Analysis of Behavior of Beam-to-column Connections Jointed by Top and Seat Angle in Steel Frame

    钢框架梁柱顶—底角钢连接的节点性能分析

    Construction Practice on Pulling Down Wall to Add Beam and Column in Brick Masonry Building Base Parts

    砖混结构房屋底层拆墙增加梁柱的施工实践

    Analysis on Transverse Effect of Urban Elevated Bridge with Broad Box Girders of Arc Bottom

    城市高架弧形底宽箱梁桥横向效应分析

    The Artistical Features of Liang Xiao-sheng s Narration about the Grassroots Since 1990s;

    九十年代以来梁晓声底层叙事的文本艺术特色

    Application of Under-reamed Bored Pile in a Bridge;

    钻孔扩底灌注桩在桥梁基础工程中的应用