Combined with the test situation of stator ground in Daba plant and examples of stator ground fault, this paper discussed the impossibility of three inner overvoltages caused by adopting arc suppression coil.
结合大坝发电厂 1号机定子接地试验情况 ,以及定子接地故障事例 ,以实际参数论证了采用消弧线圈接地产生三种内部过电压 (传递过电压、铁磁谐振过电压、发电机系统中的断线过电压 )的不可能性。
The Design of the Engineering Dispatching Automation in Shanxi s Hequ Power Plant;
山西河曲发电厂工程调度自动化的设计
This paper considers comprehensively concerned data of geology and geophysics within250 km around the Daba power plant and establishes a 3-D finite element model.
本文综合考虑了宁夏大坝电厂周围250km范围内的地质、地球物理方面的有关资料,建立了三维有限元模型。
Study on ESP efficiency test of No.2 boiler ESP using computer control in Daba Power Plant
大坝发电厂~#2炉电除尘器采用微机控制后除尘效率试验研究
The calculation analysis of the generator's negative sequence capacity for the third term project in Ningxia Daba Power Plant of Datang International Co.,Ltd.
宁夏大唐国际大坝三期电厂发电机负序能力计算分析
Technical regulation for design on ash slag damming of fossilfuel power plants
火力发电厂灰渣筑坝设计技术规定
In a dam project, for example, electrical and mechanical engineers work on the design of the powerhouse and its equipment.
例如,在大坝项目中,电气及机械工程师会参与到发电厂房及动力设备的设计中去。
Study on Dynamic Characteristics and Monitoring of Large-size Power-house of Power Station at Dam Toe;
大型坝后式电站厂房动力特性及动力监测研究
Large-size bolts assembling and disassembling in hydroturbine maintenance of Gezhouba Hydropower Plant
葛洲坝电厂水轮机检修中的大型螺栓拆装
The innovation for the control system of steam driven feed water pump in the first term project of Daba Electric Power Plant
大坝电厂Ⅰ期汽动给水泵控制系统改造
Study on Multi-industry Development Strategy for Gezhouba Hydroelectric Power Plant;
葛洲坝电厂多种经营产业集团化发展战略
(I) Nuclear power plant, large power plant, civil airports and large wharves;
(一)核电厂、大型发电厂、民用机
To Built Added Sub dam by Ash in Tongguanxi Ash Pond in Douba Power Plant
豆坝电厂铜罐溪灰场用灰渣加筑子坝
Study on Types of Hydropower Development of Zhentouba Reach on Daduhe River;
大渡河枕头坝河段水电开发方式研究
a power, chemical plant
发电厂、 化工厂.
Major technical problems on design of TGP dam and powerhouses
三峡工程大坝及电站厂房设计中的主要技术问题
From the site explorations, tentative sketches can be made of the dam location and project features such as power plants.
通过坝址查勘,就能绘制坝的位置和工程附属建筑物如发电厂方的示意图。
The largest generator in our plant is always on line.
我们厂最大的发电机一直在发电。
HOW TO EVALUATE THE BENEFIT OF HYDROPOWER PROJECTS WITH HIGH DAMS AND LARGE RESERVOIRS IN CHINA
水电开发中如何评价高坝大库水电站的效益
BUILDING THE RESIDUE DISPOSAL DAM WITH DIRECTIONAL-THROW BLASTING FOR THE SECOND POWER PLANT OF MOU DAN JIANG
牡丹江二电厂贮灰坝定向抛掷爆破筑坝
High Gravity Dam Baozhusi Hydropower Station Research on Combined Functions of Power Plant with Dam;
宝珠寺水电站高重力坝厂坝联合作用研究
本网站所收集内容来自网友分享仅供参考,实际请以各学校实际公布信息为主!内容侵权及错误投诉:1553292129@qq.com
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号