According to the importance of examination organizing design by the supervising engineer,it introduces the common principle of examination,discusses examination s main content of construction organizing design from many aspects——the general schedule of construction,plan of project schedule and constructing plan,etc.
针对监理工程师审定施工组织设计的重要性,介绍了审查的一般原则,从施工部署总进度计划、工程进度计划、施工方案等方面论述了施工组织设计的审查主要内容,以保证今后施工的顺利进行。
Comparing with the traditional theory, this paper bears two new frames of reference in planning the construction schedule.
与传统理论相比,本文在编制施工进度计划时有两个方面的突破:一是通过施工项目的工艺流程分析,来确定施工项目在线路的持续时间;二是通过施工预算来确定工程总用工。
This paper expounds the common forms and procedures of the construction schedule, and introduces the compilingprocedures and methods for the programme ofpreparatoryworks and the resources requirement plan.
阐述了施工进度计划的常用形式、步骤,介绍了施工准备工作计划以及资源需要量计划的编制过程和方法。
From the point of view of supervion,this paper anticipates the rationalization and stabilization of construction schedule provided by contractor in construction preparatory stage, and the consequences caused by an accident, then gives some advises to solve.
围绕这一问题 ,从监理单位的角度对施工准备期承包商提交的施工进度计划的合理性、预测施工进度计划的稳定性 ,以及意外事件发生的可能后果进行探讨 ,并提出相应的处理措
In order to prepare and optimize construction schedule plan,the calculation of earliest start time,latest start time,earliest finish time,latest finish time,total float and free float of the project′s works is very important.
为了编制和优化施工进度计划,计算构成施工项目的各项工作最早开始时间、最迟开始时间、最早完成时间、最迟完成时间、总时差和自由时差等时间参数十分重要。
Construction schedule plan management refers to the establishment,the implementation and the supervision of construction schedule plan.
施工进度计划是施工单位进行生产的重要依据,也是采购材料和用工计划等经济活动的参考依据,它从施工单位取得建设单位提供的设计图纸进行施工准备开始,直到工程竣工投产交付使用为止。
This paper discusses the optimum method of overall construction schedule in the view of systematization and analyszes the factors concerned with overall schedule.
本文从系统观点出发,首先对影响施工总进度计划的有关因素进行了分析,建立了以系统总体经济效益最好(即施工总费用最少)为目标的施工总进度计划优化数学模型,并提出了解此模型的计算机方法,通过算例求解介绍了使用该程序的具体步骤。
Base on PERT for Project Schedule Planning Control System;
基于PERT的工程进度计划控制管理系统
Research on Petroleum Pipeline Project Schedule Management System
石油管道工程进度计划管理系统研究
Establishment of Jordan AMCP Cement Project Schedule Plan and Analysis of Influencing Factors on Schedule;
约旦AMCP水泥项目工程进度计划的编制及工程进度影响因素分析
Research on the Simulation of Integrated Project Scheduling and Material Ordering Problems;
集成工程进度计划与原材料订货仿真研究
Plan and Control of Schedule in Telecommunication Design Project
通信工程设计项目的进度计划与控制
New Consideration on Designing Unit Construction Schedule;
编制单位工程施工进度计划的新思路
development programme
发展进度表;发展进度计划;发展计划;建筑工程时间表
Study on Schedule Risk Analysis in the Engineering Project Network Planning and Critical Chain Scheduling;
工程网络计划进度风险分析及关键链进度计划法研究
Differences between schedule progress and actual progress in construction of railway projects;
谈铁路工程的设计计划进度与实际施工进度的差异
The project is proceeding as planned.
工程正在按计划进行。
The PERT Plan Management Software Used for the Overhaul Engineering in Power Plant
发电厂大修工程网络进度计划管理软件
Research of Schedule Plan and Schedule Control of Fire System of Jingshui Building;
晶水大厦消防工程项目进度计划与控制研究
Research on the Plan Establishment and Progress Control for Offshore Engineering Fabrication;
海洋工程建造计划编制和进度控制研究
Schedule Plan and Schedule Control of JD Smart Card Applying System;
JD校园一卡通工程(一期)项目进度计划与控制
Research of Schedule Plan and Schedule Control of Maintaining Project of Qintglonchang Flyover;
青龙场立交桥维修工程项目进度计划与控制
Tentative Study on the Family Planning Work in Urban Areas during the Course of Household Registration System Reform;
户籍制度改革进程中的城市计划生育工作探讨
CONSTRUCTION AND INVEST MANAGEMENT MODEL BASED ON NETWORK PLAN;
基于网络计划工程建设的进度/投资管理模型
Research on Time Optimization of Control of the Project about the Making and Contrating of Box Beam of He-Ning Railway Engineering
合宁铁路工程箱梁制架项目进度计划优化研究