It is proposed that only when the monitoring datum of ground displacement is properly selected and monitoring scheme,monitoring stations arrangement and monitoring period are optimized.
本文探讨了影响边坡位移监测精度的若干主要技术问题,认为只有选择恰当的地表位移监测基准,并对监测方案、监测站的布设和监测周期的设计等技术问题进行优化,才能满足边坡变形监测的要求。
This paper analyses some problems of deformation monitoring, example of the monitoring datum, monitoring method and precision, deformation analysis and prediction, etc.
主要对大堤施工期的变形监测问题 ,如监测基准、监测方法与精度、变形分析与预报等进行分
Application Modbus Protocol in the Monitoring System of Mine Roof
Modbus协议在矿井顶板监测系统中的应用
Study on Dynamic Monitoring System Based on Ethernet for the Top in Coal Mine;
基于以太网的煤矿顶板动态监测系统研究
Research and Design of KJ132 Bus Roof Separation Monitoring System
KJ132总线式顶板离层监测系统研究与设计
Software development for bolting roadway roof separation monitoring system
锚杆支护巷道顶板离层监测系统软件的开发
Design of Remote Signal Transmission System in Mine Roof Descending Monitoring
矿井顶板下沉监测中信号远程传输系统的设计
Application on Roof Seperation Monitor System in Gushuyuan Mine
顶板离层监测报警系统在古书院矿的应用
Design and Research on Roof Safety Monitoring Data Integration Platform
顶板安全监测数据集成平台的设计与研究
Monitoring and Analysis of the Jacking Force of the Large Diameter GRP pipe-jacking in soft soil
软土地区大口径玻璃钢夹砂顶管顶力监测分析
Fuzzy Comprehensive Evaluation and Prediction of Coal Seam-roof Stability Based
煤层顶板稳定性模糊综合评判和预测
Dynamic Features and Prediction Method of Large Roof Pressurized
大面积顶板来压动力表征及预测方法
Detector of Coal Seam Roof Strata Based on S3C44B0X Framework
基于S3C44B0X构架下的煤层顶板岩层探测器
Study on Monitoring Tactic for the Plate Thickness and Crown of Cold Rolling Strip;
冷轧带钢板厚、板凸度监测策略的研究
Analysis on the seepage monitoring data of Sanbanxi face-slab rock-fill dam
三板溪面板堆石坝渗流监测资料分析
Research and Development of the Field Monitoring System for the Displacement of the Top of Pier for the High-pier Bridge;
高墩桥墩顶位移现场监测系统的研发
The ventilating and methane monitoring technology of Yunding high methane tunnel
云顶高瓦斯隧道通风及瓦斯监测技术
Analysis on Vertical Displacement Monitoring Data of Jicun Dam Crest
纪村大坝坝顶垂直位移监测资料分析
Application and Testing Method Discussion of Charged Plate Monitor
充电板监测仪的应用及测试方法论述
Monitoring and Prediction Analysis of Overpass Foundation Ditch Which is Used for Frame-jacking Construction;
立交框架顶进工作基坑的监测与预测研究
本网站所收集内容来自网友分享仅供参考,实际请以各学校实际公布信息为主!内容侵权及错误投诉:1553292129@qq.com
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号