This text introduced the practice method of the box permanent steel petroleum derrick shaft sinking in the construction of vertical shaft pit shaft.
在立井井筒建设中,我们在原设计的基础上,对箱形永久钢井架凿井的实际方法作了改进。
Monitoring for sidewall safety in deep alluvium freezing shaft sinking engineering is discussed in the paper.
重点介绍了深厚表土中冻结法凿井的井壁安全监测技术,利用现代计算机控制和远程通信技术,通过电话网和调制解调器,借助预埋的传感器,经过信息的分析和反演,实现了冻结法凿井中对井壁的远程全自动安全监测。
Through the practice of Guqiao auxiliary shaft construction, this paper discusses how to increase the shaft sinking velocity with the existing technology and equipment.
如何利用国内现有的凿井技术、凿井设备提高建井速度,本文通过对顾桥副井的建井实例进行了深入的分析探讨。
The paper introduced the freezing shafting sinking method,full face shaft drilling method,grouting method and other special shaft sinking methods generally for the mine shaft construction in water bearing and unstable alluvium and water bearing bedrock.
介绍了在含水不稳定冲积层和含水基岩中建设井筒通常采用的冻结法、钻井法和注浆法等特殊凿井方法,以及这3种特殊凿井方法的发展历程和关键技术现状及典型工程应用实例,并对这些方法今后的发展进行了展望。
The main problems in the electric controlling part of the traditional sinking hoist are introduced,a frequency conversion adjusting speed controlling system is designed based on the load characteristic and behavior of the sinking hoist,and the application of ACS800-01 frequency converters in the system is emphatically analyzed.
简要介绍了传统凿井绞车电气控制部分存在的主要问题,结合绞车负载特性及运行状态进行了变频调速控制系统的设计,重点分析了ACS800-01变频器在该系统中的应用情况。
In shaft construction,many sinking hoists were used to hang or bring to the stretch equipment like Hang dish,and template.
立井施工期间,采用多台凿井绞车同时悬吊或张紧一个设备,如:吊盘、模板等。
Shaft sinking winch
GB/T15112-1994凿井绞车
Experience on the shrink shaft drilling construction reserve period
缩短立井井筒凿井施工准备期的经验
Kind-Chaudron process
金特-肖德隆凿井法
construction survey for conventional shaft sinking method
普通凿井法施工测量
construction survey for special methods of shaft sinking
特殊凿井法施工测量
Design Optimization of Drilled Shaft Lining Structure in 1000m Deep Shaft
千米深井钻井法凿井井壁结构设计优化
The Present Situation and the New Developing Trend of 1000m Deep Shaft Sinking Technology
千米深井凿井技术现状及发展新动向
Desigh of Centralized Control System of Sinking Hoist in Shaft Construction
立井施工凿井绞车集中控制系统设计
On the Derrick Installation of ShaftⅣ_G In main Shaft of a Coalmine
浅谈塔然高勒煤矿主井IV_G凿井井架安装
Freeze Sinking Sidewall's Stress Analysis Considering Damage under Complicated Load;
复杂荷载下冻结凿井井壁损伤应力分析
Research on the Influence of Frost Heave of Frozen Soil to Derrick Footing in Freezing Sinking Shaft;
冻结法凿井冻土冻胀对井架基础影响的研究
Analysis and Prevention of Freezing Tube Breakage in Deep Shaft Freezing Sinking;
深井冻结凿井冻结管断裂原因分析及防治技术
The Key Technology of Freezing Repairing Shaft of the 658m Soft Rock Drilling Shaft
658m软岩普通法凿井井筒冻结修复关键技术
Frozen method applied in excavation of vertical shaft of iron ore mine
冻结法凿井技术在铁矿山竖井中的应用
Application of Waste Drilling Mud Treatment Technology for Mine Full Face Drilling
钻井法凿井废弃泥浆处理技术的研究应用
New construction technology of setting large steel-structure shaft frame during shaft sinking
凿井期间起立大型钢结构井架施工新技术
Gangue Vertical Shaft Sinking Mechanization Equipment and Technology Application to Xintie Coal Mine
新铁煤矿矸石立井凿井机械化装备与技术应用
Safe and Rapid freezing Process in Deep Impact Layer of Guqiao Main Shaft
顾桥主井厚冲积层冻结法凿井施工技术
本网站所收集内容来自网友分享仅供参考,实际请以各学校实际公布信息为主!内容侵权及错误投诉:1553292129@qq.com
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号