In the scheme,a small vertical shaft is installed,through which the concrete is delivered.
系统介绍了中江人民渠引水隧道第2合同段二次衬砌混凝土运送方案,该方案主要利用小竖井投送混凝土解决了带有斜井的小断面隧道混凝土运送难题。
The most of shaft wells of TGP s permanent shiplock characterize as large section, shaft well group, double steel bar, and large amount of accurately embedded metal structure and especially for the lower shiplock chamber section, the structure is complicated and the steel bar is dense.
三峡水利枢纽永久船闸竖井多为大断面、多井群组合结构,且为双层钢筋,又有大量高精度要求的金结埋件,尤其是下部闸室段结构复杂,钢筋密集,因此工作量大,施工干扰大,施工难度大。
The outfall pressure shaft well in the third-step pumping station of main canal of Wanjiazhai Huanghe Water Transfer Project in Shanxi Province is lined with reinforced concrete and constructed by using hydraulic climbing form.
山西省万家寨引黄工程总干三级泵站出水压力竖井为钢筋混凝土衬砌 ,采用了液压滑升模板施工 ,节省了多次立模和拆模工序 ,加快了施工进度。
In order to protect the cast concrete at the shaft well section of the power tunnel against corrosion by several strong corrosive mediums,a protection project at the outer sidewall of the shaft well is needed.
“6 35”水利枢纽已浇筑的发电洞竖井混凝土受到多种强腐蚀介质的侵蚀影响 ,需在竖井外壁进行加强性工程防腐处理 。
Application of gyroscope in the directional silo measure;
陀螺仪在竖井定向测量的应用
Numerical Simulation of Fan Influence in Long and Large Road Double-silo Tunnel Intake and Exhaust Ventilation Mode;
长距离大直径公路隧道双竖井送排式通风中风机影响的数值模拟
The Protection Methods and Construction Techniques for Under Drain and Silo of Karez;
坎儿井暗渠和竖井防护措施及施工技术
The shaft of a mine.
竖坑矿的矿井或竖井
shaft-sinking [caisson works]
打/挖竖井〔沉箱工程〕
multi-level outlet shaft spillway
多层进水竖井式溢洪道
Tsiu Keng Shaft Raw Water Irrigation Pump House
蕉径竖井原水灌溉泵房
Cheung Sha Shaft Raw Water Pumping Statio
长沙竖井原水抽水站
Lining Slipform Construction Technology of Sending and Exhausting Single-shaft
单井送排风式竖井衬砌滑模施工技术
The excavation speed of pilot shaft is one of the key difficulties for the excavation of shaft, high ones in special, of hydropower works.
水电工程竖井特别是高竖井开挖,主要难点体现在竖井导井开挖的速度上。
Flooding of three vertical shafts trapped the miners as they changed shifts.
三个竖井发生透水,把正在换班的工人困在井下。
The 3# Ventilation Shaft back well method Construction Technology of Qinling Zhongnanshan Highway Tunnel
秦岭终南山公路隧道3#竖井反井法施工技术
Shaft Liner Design of Development Shaft for Phase Ⅲ Project in Lancang Lead Mine
云南澜沧铅矿三期开拓竖井井筒的支护设计
Frozen method applied in excavation of vertical shaft of iron ore mine
冻结法凿井技术在铁矿山竖井中的应用
Research on the preliminary thickness design of shaft lining in porous rock aquifer
孔隙型含水基岩段竖井井壁厚度拟订设计研究
Anti-well construction technique of 3# shaft of Zhongnanshan road tunnel in Qinling
秦岭终南山公路隧道3号竖井反井法施工技术
Summarization on large diameter vertical shaft back well method excavation construction technology
关于大直径竖井反井法开挖施工技术概述
In-situ measurement and analysis of freezing pressure of vertical shaft lining in deep alluvium
特厚冲积层竖井井壁冻结压力的实测与分析
access shaft [aviation fuel receiving facility]
进出竖井〔飞机燃料接收设施〕
It runs down a shaft to the seventh floor.
它沿一个竖井向下直通到第七层。
The air flows down to a shaft and thus loses potential energy.
空气向下进入竖井,因而失去势能。
本网站所收集内容来自网友分享仅供参考,实际请以各学校实际公布信息为主!内容侵权及错误投诉:1553292129@qq.com
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号