The Leakage Problem of CRDM in Ling ao Station Unit 1;
岭澳核电厂L1号机组控制棒驱动机构泄漏问题
3-D Design Method for Welding Groove and Seal Weld of Reactor CRDM Adapter;
反应堆控制棒驱动机构管座焊接坡口及密封焊焊缝三维设计
Seismic appraisal test of control rod drive mechanism of China Experiment Fast Reactor;
中国实验快堆控制棒驱动机构抗震鉴定试验
Control rod drive line hot comprehensive test for Qinshan Phase Ⅱ NPP Project is a key project of 揺ighth five-year plan? The rod drop performances and life qualification under all kinds of conditions of the control rod drive line were performed in the test to provide informations for Qinshan phaseⅡ safe operation.
秦山核电二期工程控制棒驱动线热态综合试验是国家“八五”重点科技攻关项目。
本网站所收集内容来自网友分享仅供参考,实际请以各学校实际公布信息为主!内容侵权及错误投诉:1553292129@qq.com
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号