您好,欢迎访问优校网! 收藏本页 手机访问
今天是:

original trial production shop是什么意思


中文翻译原试制车间

网络释义

1)original trial production shop,原试制车间2)trial production shop,试制车间3)testing shop,试车车间4)shop trial,车间试车5)Commissioning at tableland,高原试车6)test box( of engine),试车间

用法例句

    The Researching of Algorithm for Bay-Layout in Semiconductor’s Assembly and Test Department

    半导体封装测试车间隔间布局算法研究

    Single commissioning could be performed during the course of erection.

    单机试车可以在安装期间进行。

    Each machine is tried before it leaves the shops.

    每台机器运出车间之前,都要试用一下。

    "In the period of Erection, Test Runs, Commissioning, Performance Test, operation, and maintenance of the Contract Plant"

    在合同项目的安装、试车、投料试生产、性能测试、运行和维修期间

    Exam time was near, and more and more students were burning the midnight oil.

    考试时间快到了,开夜车念书的学生越来越多了。

    We are trying to repair the car to have wasted whole afternoon time.

    我们试着修汽车浪费了整个下午的时间。

    Study on the Occupant Survival Space of Commercial Vehicle in the ECER29

    商用车ECER29法规试验中乘员生存空间的研究

    Test methods and requirements of electrical connections between motor vehicles and towed vehicles

    GB/T5053.3-1985汽车与挂车之间电连接器的试验方法与要求

    All the practice must comply with the above timetable (except the track tent out to individual).

    所有试车均严格执行以上时间表(赛车场租出除外)。

    If there is no race &rent out on Fri 、sat &sun ,the track will be opened for paid practice .

    如赛车场无赛事及出租,星期五、六、日亦招待以上试车时间。

    Change over test between shaft generator and diesel generator on sea trial.

    航行试验中轴带发电机与柴油发电机之间的换车试验。

    a test rig

    试车装置, 试验台

    original body assembly shop-welding shop

    原总装车间-焊装车间

    The performance test shall be finished within the trial production period of 2 months after completion of hot commissioning of production line.

    验收时间:验收考核在机组热负荷试车结束后2个月的试生产时间内进行。

    "The commissioning shall consist of single commissioning, cold commissioning and hot commissioning. "

    调试应该包括单机试车、冷试车和热试车。

    An optical shop, in the business of making lenses, will have a set of precision spherical test plates or gauges.

    制造透镜的光学车间,应当有一套精确的球面测试板即球面规。

    Full-scale Study to Remove Odor from Dewatering Shop in the Shahu Sewage Treatment Plant with Bio-filter;

    沙湖污水处理厂脱水车间生物塔除臭生产性试验研究

    Safty brake time for the idle stroke of mine hoist and winch

    矿用提升机和提升绞车之安全制动空行程时间测试方法探究