The relationship among the three objectives (quality, pace and investment) for building a hydropower project and how to use different planned investment curves and real curves to carry out integrated control of these objectives are explained.
在阐述工程建设质量、进度、投资相互关系的基础上,提出如何通过各类计划投资曲线和实际投资曲线,完成对水电工程建设质量、进度、投资的联合管理。
Study on integrated management model of groundwater and surface water for prevention of soil salinization;
防治土壤盐碱化地表水地下水联合管理模型
本网站所收集内容来自网友分享仅供参考,实际请以各学校实际公布信息为主!内容侵权及错误投诉:1553292129@qq.com
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号