It is not the best method , in the same time, the infection of consignment time, the burthen of equipment and overtime should be considered.
文章阐述了在流水线调度时,可利用遗传算法计算出工件的最短通过时间,但这并非最佳方案,应同时考虑交货期的影响、设备的负荷率和员工加班等问题。
Coordinating producer and supplier is one of main issues of supply chain with uncertain delivery.
供应链中在不确定JIT交货条件下如何进行供应商与生产商之间的协调是一个十分重要的问题。
Also,emphatically analyzed is the adaptability of the new standards for chemical compositions of steel grade,manufacturing process and delivery conditions,and the test teams and frequency of the tubes.
介绍了2004~2005年欧洲首次颁布的4项不锈钢新标准的总体特点,着重分析了其中有关钢种的化学成分、制造过程和交货条件、质量检验项目和频度选择的灵活性和技术先进性。
本网站所收集内容来自网友分享仅供参考,实际请以各学校实际公布信息为主!内容侵权及错误投诉:1553292129@qq.com
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号