您好,欢迎访问优校网! 收藏本页 手机访问
今天是:

timber pile anchorage是什么意思


中文翻译木桩锚碇

网络释义

1)timber pile anchorage,木桩锚碇2)steel pile anchor,锁桩锚碇3)single pile anchor,单桩锚碇4)steel sheet pile anchorage,钢板桩锚碇5)anchorage,锚碇6)anchor,锚碇

用法例句

    Test study on mechanism of shear-slip of anchorage in suspension bridge;

    悬索桥锚碇剪切滑移的机理及试验初探

    Design and construction of anchorage system for steel cofferdam;

    泸州长江大桥主墩钢围堰锚碇系统的设计与施工

    Finite Element Analysis on the Temperature Field of the Massive Concrete Anchorage of Haicang Bridge

    海沧大桥大体积混凝土锚碇温度场有限元分析

    As an important part of supporting structure,anchoring controls the project progress of suspension bridge.

    锚碇作为承力结构的重要部分,是悬索桥的重点控制性工程。

    The paper introduces the experience of applying D-B model to the construction of the south anchor of Wuhan Yangluo Changjiang Highway Bridge.

    介绍武汉阳逻长江公路大桥南锚碇工程采用设计-施工总承包模式的经验,对相关的招标和项目管理工作进行总结。

    Engineers made 2 plans for position of prestressed steel pipes of the north anchoring system of Wuhan Yangluo Changjiang River Road Bridge.

    武汉阳逻长江公路大桥北锚碇锚固系统预应力钢管定位,采用了门式桁架初步固定预应力钢管、安装过程中用全站仪测量,并通过微调装置控制的方法。

    The anchorages may be located on the outside of the deck.

    锚碇可布置在桥面板上。

    Tunnel-type anchorage (TTA) is one of the two anchorage types used in long suspension bridge.

    隧道式锚碇是适用于大跨径悬索桥的两种锚碇形式之一。

    The design and calculation of the rear anchorage system are expounded here in this paper.

    详细介绍了后锚碇锚固体系的设计和计算

    Precise Position of Prestressed Steel Pipes of the Anchoring System of a Road Bridge

    某公路大桥锚碇锚固系统预应力钢管精确定位

    Construction of Prestressing Anchor System in South Anchorage of Suspension Bridge of Runyang Bridge

    润扬大桥悬索桥南锚碇预应力锚固系统施工

    The cables were wrenched from their fastenings.

    悬索从它们的锚碇处扭断。

    STABILITY OF THE ANCHORAGE WALL ROCK OF TUNNEL FOR CHONGQING EGONGYAN BRIDGE

    重庆鹅公岩大桥隧道锚碇围岩稳定性

    Design and Construction of Compound Tunnel Anchorage of Suspension Bridge

    悬索桥隧道式复合锚碇的设计与施工

    Excavation of South Anchorage Foundation Pit of Suspension Bridge of Runyang Bridge

    润扬大桥悬索桥南锚碇基坑开挖施工

    Comparison and Selection of North Anchorage Foundation Alternatives for Runyang Bridge Suspension Spans

    润扬大桥悬索桥北锚碇基础方案比选

    STUDY ON MECHANICAL BEHAVIOUR OF TUNNEL ANCHORAGE SYSTEM FOR SUSPENSION BRIDGE

    悬索桥隧道式锚碇系统力学行为研究

    Research on displacement of anchorage of suspension bridge

    悬索桥重力式锚碇结构变位规律研究

    Technique Measures in the Construction of Open Caisson for the Dalian Xinghai No.1 Bridge;

    大连市星海1号桥锚碇沉井施工技术

    Application of Tunnel Anchorage with Anchor Rods to Anchor System of the Second Yangtse River Bridge in Wanzhou City

    隧道式锚碇加锚杆在万州长江二桥锚固系统中的应用

    The anchorage design of cable-crane is applied extensively in bridge construction.

    缆索吊机锚碇设计在桥梁施工中应用十分广泛。

    TESTING STUDY ON FIELD STRUCTURE MODEL OF THE EAST ANCHORAGE OF GUANGDONG HUMEN BRIDGE

    广东虎门大桥东锚碇现场结构模型试验研究

    Analysis of Earthquake Liquefaction of North Anchorage of Jangyin Highway Bridge Over the Yangtze River

    江阴长江公路大桥北岸锚碇地震液化探讨

    Experimental Study on the North Anchorage of the Jiangyin Yangtze Bridge

    江阴长江公路大桥北锚碇模型试验研究