Technique Main Points on Operation and Management for Start Firedamp Pool Charging;
沼气池装料启动操作技术和管理要点
Radial distribution of burden is determined by the position of particle landing during charging in blast furnace.
在实际装料时,不同密度、粒径及形状系数的颗粒在料面上的落点也各不相同。
Based on the practice,the concept and methods logy of selecting the regimes for thermal balance,blasting,slag-making and charging are given.
在实践总结的基础上 ,给出强化后高炉热制度、送风制度、造渣制度和装料制度的选择理念与方法。
The high temperature gas cooled reactor physics simulation code VSOP was used for the prediction of the fuel loading for HTR 10 first criticality.
该文利用高温气冷堆物理模拟程序 VSOP对 HTR- 10初次临界装料进行预估 ,计算了初次临界所需燃料球和石墨球数 ,为临界实验提供依据。
Charge control,under hearth mechanism rotation control,discharge control,slag removal control and automatic tapping slag control are emphatically introduced.
介绍了环形加热炉的电气控制功能及实现,重点介绍装料控制、炉底机械旋转控制、出料控制、扒渣控制及自动出渣控制。
本网站所收集内容来自网友分享仅供参考,实际请以各学校实际公布信息为主!内容侵权及错误投诉:1553292129@qq.com
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号