Start-up time can be saved by controlling the optimum velocity time of feeding, optimum temperature-rise time of low-pressure converting furnace and adding self-heating balance design.
通过寻找化工投料的最佳速度、时间及低变炉最佳升温时间,并加设合成塔催化剂的自热均衡设计等措施,可以节约开车时间,减少经济损失。
本网站所收集内容来自网友分享仅供参考,实际请以各学校实际公布信息为主!内容侵权及错误投诉:1553292129@qq.com
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号