您好,欢迎访问优校网! 收藏本页 手机访问
今天是:

stowage certificate是什么意思


中文翻译装载合格证

网络释义

1)stowage certificate,装载合格证2)cargo gin,装卸设备合格证3)periodical loadline renewal,载重线合格证定期更新4)loading certificate,装载证书5)loading warranty,装载保证6)verification of conformity,合格验证

用法例句

    periodical loadline renewal

    载重线合格证定期更新

    MARPOL oil renewa

    船舶防油污合格证更新

    International Load Line Certificate

    国际船舶载重线证书国际载重线证书

    If a party, as in violation of the Regulation on the Inspection of Vessels and Marine Installations, forges the vessel inspection certificate, or alters the vessel load line without authorization,

    违反《船舶和海上设施检验条例》的规定,伪造船舶检验证书,或擅自更改船舶载重线,

    A blog is a regularly updated online journal.

    部落格是一种固定更新的线上日志。

    International Load Line Exemption Certificate

    国际载重线豁免证书

    load line exemption certificate for United Kingdom

    英国载重线免除证书

    certificate of approval of the marking

    载重线标志批准证书

    (i) ongoing updates on the conformity assessment bodies that are recognized by China

    (i)不断更新中国承认的合格评定机构

    International Load Line Record

    《国际载重线勘定记录》

    Check the Toe setting on the vehicle and reset if not within specifications.

    检查车辆束角,如不合规格则重新设定。

    Some short courses designed on modular basis are grouped into various streams under Diploma and Certificate programmes.

    部分短期课程更可以用组合形式获取证书或文凭资格。

    On Dialectical Combination of Route Basing on the People and Investigate Technology in New Period;

    论新时期民本路线与侦查科技的辩证结合

    The recurrence start date doesn't correspond to the recurrence pattern. Change the recurrence start date to day %1 of the month.

    重复周期的开始日期不符合定期模式。将重复周期的开始日期更改为该月的第 %1 天。

    The recurrence start date doesn't correspond to the recurrence pattern. Change the recurrence start date from a weekend day to a weekday.

    重复周期的开始日期不符合定期模式。将重复周期的开始日期从周末更改为工作日。

    The recurrence start date doesn't correspond to the recurrence pattern. Change the recurrence start date to the %1 %2 of %3.

    重复周期的开始日期不符合定期模式。将重复周期的开始日期更改为%3的%1%2。

    The recurrence start date doesn't correspond to the recurrence pattern. Change the recurrence start date to %1 %2.

    重复周期的开始日期不符合定期模式。将重复周期的开始日期更改为 %1 %2。

    The recurrence start date doesn't correspond to the recurrence pattern. Change the recurrence start date to the %1 %2 of the month.

    重复周期的开始日期不符合定期模式。将重复周期的开始日期更改为该月的 %1 %2。