您好,欢迎访问优校网! 收藏本页 手机访问
今天是:

before after design是什么意思


中文翻译事前事后设计

网络释义

1)before after design,事前事后设计2)beforeafter design,事前事后设计3)ex-ante,事前4)in advance,事前5)pre-supervision,事前监督6)control in advance,事前控制7)pre-control,事前控制8)pre-auditing,事前审计9)prior control,事前控制10)pre-evaluation,事前评价

用法例句

    Audit is a basic and very important work in the financial management in the hospitals,Through pre-audit and pre-supervision.

    医院的审核工作,是单位财务管理中的一项最基础又及其重要的工作,通过事前审核、事前监督,能加强经济核算和财务管理,提高经济效益。

    Generally speaking, the supervision of the chief financial supervisor is divided into the pre-supervision and the post-supervision.

    财务总监制度的设立,是现代企业制度发展的要求,一般说来,财务总监的监督分为事前监督和事后监督。

    Engineering quality control is important content in constructing management, the paper discusses three phrases in controlling engineering quality: control in advance, control in the event, and control after the event.

    主要论述了工程质量事前控制、事中控制和事后控制的3个阶段。

    This paper makes a brief introduction to the general situation and the major measures for schedule control in Shenzhen Metro Phase 1, emphasizing through practical cases the roles played by the control in advance and integrated coordination in schedule control.

    简要叙述深圳地铁一期工程概况,介绍工程进度控制的主要措施;通过工程实例,说明事前控制和综合协调在进度控制中的作用;阐述进度控制的体会,分析存在的经验和教训。

    How to do well the pre-control of engineering quality of supervision engineer;

    监理工程师应如何做好工程质量的事前控制

    On how to make a pre-control of installation project supervision of high building;

    浅谈如何搞好高层建筑安装工程监理的事前控制

    According to the government-invested infrastructure project, the paper analyses the cause of the high removal cost, and introduces pre-auditing mechanism, fund supervision mechanism, contract mechanism and competition mechanism, to effectively reduce the removal cost.

    围绕政府投资的市政基础设施项目,通过对城市房屋拆迁高成本原因的分析,提出引入事前审计机制、资金监管机制、承包机制和竞争机制,以实现切实降低拆迁成本的目标。

    ,basing on the principle of prior control before accident,Construction Quality Management was discussed in the construction quality control of this type of engineering.

    以利莱森玛(福州)制造基地主车间及综合楼PHC管桩施工为例,在施工质量控制工作中,以事前控制为指导思想,施工前认真研究工程地质、场地及环境等条件,分析PHC管桩静压施工时可能存在或出现的问题,包括压桩机沉陷问题、配桩问题、桩位偏移问题、压桩顺序及桩的上浮问题,提出有针对性的施工技术和质量管理措施,使各重要施工技术环节都得到周密完善的事前控制,从而取得相当满意的工程实施效果。

    Aiming at the common fault about the quality in the built-in construction in the construction work,it introduces the quality control measures from two aspects of prior control and process control,and represents the method of creating target responsibility system aiming at the quality management in order to ensure the built-in construction in the construction work.

    针对建筑安装工程中预埋施工存在的质量通病,从事前控制、过程控制两方面介绍了其质量控制措施,针对质量管理,阐述了质量目标责任制的建立方法,以保证建筑安装工程预埋施工质量。

    A Pre-evaluation Model and Its Demonstration for Manufacturing Information System Project;

    制造业信息化建设的事前评价模型及实证分析

    Setting out from enterprise performance,this paper establishes a practical pre-evaluation index system for enterprise with the view of Balanced Scorecard,and with the fuzzy comprehensive evaluation,and evaluates now-existing system as a whole.

    从企业绩效的角度出发,基于平衡计分卡思想制定了适合企业信息化事前评价的指标体系,利用模糊综合评判法对该企业进行整体评价。